RhinoFabStudio

Parametric Design + Optimization + Digital Fabrication

Our installation for Riley Hospital for Children is complete, after over a year in the making. The facility is still under construction and is scheduled to open June 1, 2012. Please enjoy the videos above highlighting all of the fabrication and installation.

The Simon Family Tower addition began in summer 2006 and will be completed by the end of the year. The Sunrise is located on the first floor in the main atrium space within three recessed wall cavities, totaling an area of 768 sf. The project was fully developed using Grasshopper, integrating image readers and custom color outputs. In total there are over 3800 unique components making up the image and surface, each with a different color, scale, and distance from the wall.

Views: 31

Comment

You need to be a member of RhinoFabStudio to add comments!

Join RhinoFabStudio

Translate Language:

RhinoFabStudio

Learn all about Rhino

© 2024   Created by Andres Gonzalez.   Powered by

Badges  |  Report an Issue  |  Terms of Service