RhinoFabStudio

Parametric Design + Optimization + Digital Fabrication

Time lapse of the fabrication of one of 9 large accoustic panels for the new Bing Concert Hall at Stanford University. Fabrication of the complex geometry of the wall and ceiling panels takes place at Kreysler & Associates in Napa, CA.

Video begins at the early stages of surfacing the mold, and ends with the steel space frame in place, but before demolding.

Video is recorded at one frame per minute.

Views: 68

Comment

You need to be a member of RhinoFabStudio to add comments!

Join RhinoFabStudio

Translate Language:

RhinoFabStudio

Learn all about Rhino

© 2024   Created by Andres Gonzalez.   Powered by

Badges  |  Report an Issue  |  Terms of Service